Re-Roofing in Taranaki
Full roof replacement on an existing home, anywhere in Taranaki. Old roof off, any rotten timber sorted, new roof on - and the house watertight before we leave each day.
When a Roof Has Done Its Time
A lot of Taranaki's housing went up in the 1960s and 70s, and a lot of those roofs have never been replaced. Fifty or sixty years of rain, wind and, on the coast, salt will finish any roof eventually. The signs are usually the same: rust bleeding out from around the nail heads, coating that has chalked and lifted, sheets that have thinned to the point where a boot goes through them, and a stain on a ceiling that has nothing obviously above it.
A re-roof is the most common job we do. It is also the one where the difference between a good roofer and a poor one is easiest to see - not in the new roof, which looks fine either way on day one, but in what is underneath it, how the house was kept dry while it was open, and what state the property was left in.
How a Re-Roof Runs
-
Inspection and quote
We get up on the roof and look at it properly: the sheets, the flashings, the spouting, the penetrations, and what we can see of the timber. Then you get a written, itemised quote naming the product and the colour.
-
Material ordered, dates agreed
Longrun rolled to the exact length of your runs. We give you a start date and a finish date, and we keep to them.
-
Scaffold and edge protection up
Not optional and not skipped on a single storey. It is how the job gets done safely and how it gets done neatly.
-
Stripped in sections, closed in each day
We take off only as much as we can close in the same day, so your house is never left open overnight. Any rotten purlin or damaged timber is replaced before the new roof goes on, and we show you what we found.
-
New roof, flashings and spouting
New underlay, new sheets, new flashings and ridging. Old spouting is usually at the end of its life too, and this is the cheapest moment to replace it.
-
Clean up and walk around
All old material taken away, the lawn and gardens checked for stray fixings, and a walk around with you at the end so you can see what has been done.
Repair, or Replace?
Not every tired roof needs replacing. If the sheets themselves are sound and the problem is one flashing, a few fixings or a single damaged area, a repair is the right answer and we will say so - even though a re-roof would be worth a great deal more to us. Replace it when the coating has failed across the whole roof, when the fixings are letting go in more than one place, or when you are spending money on it every year.
The one thing not to do is wait. A small leak that has been running into the ceiling space for two winters costs far more in timber, insulation and plaster than the re-roof it was putting off.
Re-Roofing on the Coast
If your house is at Ōakura, Ōpunake, Waitara or anywhere within a few hundred metres of breaking surf, the specification changes. Salt works hardest on the fixings, the cut edges and the flashings, so those are where the money goes: a substrate and coating rated for a marine environment, and fixings to match. It adds a little to the price. It adds a great deal to how long the roof lasts.
Not Sure If Your Roof Needs Replacing?
Ring us. We will come and look, tell you honestly what we think, and put a price on it either way - repair or replace. No obligation.
Book a free roof check
Re-Roofing Questions
How long does a re-roof take?
A straightforward single-storey house is usually a few days on site. A larger or more complex roof, a two-storey home, or a job where a lot of timber needs replacing takes longer. We tell you the start and finish dates before we begin, and the house is closed in every night in between.
Can I stay in the house while it is being re-roofed?
Yes. It is noisy during the day and there will be scaffolding around the outside, but the house stays weathertight and you do not need to move out. We will let you know which rooms are being worked over on which day.
What happens if you find rotten timber?
We replace it before the new roof goes on, and we show you what we found. Covering rotten purlins with a new roof is how a re-roof ends up needing to be redone. The quote says how timber replacement is priced, so there are no surprises in the invoice.
Do you replace the spouting at the same time?
We can, and we usually recommend it if the spouting is the same age as the roof. The scaffold is already up and the fascia is already accessible, so it is the cheapest moment there will ever be to do it.
Do you take the old roof away?
Yes. All of it - old sheets, old flashings, old underlay, offcuts and packaging. Disposal is shown as its own line on the quote. Steel is recycled.
What Else We Do
Three things, done properly: new roofs on new builds, re-roofs on existing homes, and roofing for light commercial buildings - right across Taranaki.
New Roofs
Roofing for new builds and extensions across Taranaki, booked around your build programme so the frame is not left standing open waiting on us. Read more
Light Commercial Roofing
Workshops, sheds, small retail and rural buildings across Taranaki, programmed so your business keeps running while the roof goes on. Read moreGet a Free Roofing Quote in Taranaki
Tell us what the job is and roughly where it is, and we will come out, have a proper look at the roof and give you a written price. No obligation, and no pressure if you want to sit on it and think it over.
020 4085 7477- [email protected]
- Based in New Plymouth, working across Taranaki
- Monday to Friday, 7am to 5pm
Roof leaking right now? Ring rather than filling this in - we will get someone to you faster than an email gets read.